
Objective: To finalize operations plan for the experiment
Two components: Scientific management and logistics with cross-over issues.
Rapporteurs: Andrew Hollis and Eric Schulz
Session 1. Science Overview, forecast issues and satellites (Chair Jim Mather)
830 Welcome Jim Arthur (Regional Director, Forecast Office)
835 Welcome, aims of meeting Tom Ackerman (PNNL, ARM)
845 Science goals overview Peter May (BMRC)
Eric Jensen (NASA)
Cornelius Schiller (SCOUT)
915 The Australian monsoon Peter May (BMRC)
Sam Cleland (NTRO)
945 Weather forecasting in Darwin during the wet season:
Techniques and performance Lori Chappel (NTRO, BoM)
Tools available for forecasting Lori Chappel
1015 MORNING TEA
1045 Discussion of forecast issues and meteorology led by Ed Zipser
Forecasting setup for the experiment – Chappel/Jakob
What ECMWF products are required?
Tools – radar, satellite, NWP displays, soundings
Briefings – Times, location, content – what is required?
1130 Operational satellites – data sets and applications
Pat Minnis (NASA)
1150 A-train overview and Cloudsat Graeme Stephens (Colorado State)
1210 Calipso Dave Winker (NASA)
1230 Aura Eric Jensen (NASA)
12 50 LUNCH
1400 Ship Operation Frank Bradley (CSIRO)
1420 Surface fluxes Nigel Tapper (Monash)
1440 Soundings Paul Lehmann (BMRC)
Toshitaka Tsuda (Kyoto)
Masato Shiotani (Kyoto)
1520 Profile sites (ARM, PARSL) Jim Mather (PNNL, ARM)
Bob Vincent (Adelaide)
1540 Modeling activities Christian Jakob (BMRC)
1600 AFTERNOON TEA
1620 Weather radar Peter May (BMRC)
1650 Lightning observations Zen Kawasaki (Osaka)
1700 Discussion of ground based network led by Jakob
Comments
Suggestions
What’s missing?
General discussion on science and observations.
1800 Close for day
This session will emphasize the need to work out the flight coordination and science goals within the overarching science questions of the project. Ideally, the following questions will be addressed:
Overview of each groups science goals (operational requirements, lead times, …)
Flight coordination (general, mission selection, design, structure)
0830 Aircraft Operations Plan: Science Goals and Expectations Mace
0900-1145: Reports on Science Goals, Operational Requirements and Desired Flight Profiles from Different Groups. Each speaker is given the following charge: Given 1 or 2 science questions that most interest their group, address the following points:
What are the specific measurement objectives for a given science question? What quantities should be measured in a given circumstance?
What aircraft evolutions are necessary to address a specific measurement objective? (e.g., flight pattern such as long level leg, spiral ascent, synergistic profiles, critical instruments, etc.)
Additional requirements for a specific measurement objective (i.e., over MMCR, in dual Doppler lobes, near cloud top, near cloud base, in TTL, below TTL, etc.)
How many repetitions are necessary to make a measurement meaningful?
0900 NASA Perspective on Science Goals & Flight Scenarios Jensen
0920 Aircraft Data Needs from the perspective of CRM modeler Starr
0940 ARM UAV/Cloud Working Group Perspective on Science Goals & Flight Scenarios McFarquhar
1000 ARM Remote Sensing and A-Train Retrieval Perspective Mace
TEA TIME
1045 SCOUT Science Goals and Objectives Schiller
1100 ACTIVE Science goals and objectives Bower
1115 Deep Convection: Science Goals & Measurement Scenarios May
1130 Dimona Measurements and Modeling Perspective Hacker/Jakob??
1145 Operational Issues: Collecting meaningful measurements in a complex environment Zipser
1205 Charge to Flight Coordination Working Group McFarquhar
The charge to the flight coordination group will be as follows. We want to develop a general model of how we are going to work out the flights. We have the following generic mission types that will address the science objectives:
Down and dirty monsoon convection:
Down and dirty break convection:
Anvil evolution:
Cirrus:
TTL cirrus
Clear sky/cold pool
For each of these answer the following:
minimum mission for each aircraft
minimum mission for this objective
synergistic flight plan to address this set of specific objectives.
takeoff schedule
potential track for each aircraft
contingencies
other issues
PM
1. Flight coordination
(Mace, MacFarquar, Zipser, Starr, Stephens, Newman, Whiteway, Hacker, May, Pilots, …)
2. Surface Obs network – logistics, real time requirements, products
(Tapper, Bradley, Mather, Lehmann, McBride, Atkinson, Christmas…
3 Forecasting and modeling - group- products, activities, trials,
(Chappel, Jakob, Krueger, …
4. Aircraft logistics – to include site visits as required (logistics representatives from each group).
900 am RAAF base meeting
11 am ARM ARCS (Atmospheric Radiation and Cloud System) site Facilities
12 pm Regional Forecast Centre
Flight coordination to meet with aircraft logistics
Surface obs to meet with Forecast and modeling group
830 Reports from working groups to include outlines of activities (30 min each, led by group chairs)
1030 Morning tea
1100 30 min discussion of working group reports
1130 Forecast “trial” planning. (led by Jakob)
How, where, by whom? Would seem to need to handle this as an exercise for a few days a week in Jan Feb using web based information.
1200 Contingency planning – (led by Mace?)
What to do if e.g.
Missing 1 or more aircraft
Tropical cyclone in general area?
Tropical cyclone directly affecting IOP area – evacuate – where to etc?
Operations in break versus active monsoon versus suppressed conditions.
Other surprises
1230 Lunch
1400 Operations plan discussion (led by May)
Where are we?
Whats missing?
Where do we have what offices/support/data systems?
Assign writing tasks and TIMELINES
1530 Afternoon tea
1600 Data policy discussion – data ownership, access, sharing, formats, repositories. (led by Ackerman)
1630 Outstanding issues (led by Jakob)
Include post-experiment meetings
Roles for students if not covered before
Followup discussions
In depth site visits:
RAAF
Aircraft support companies
Remote ground sites
Notes from early draft:
Day 1.
AM
Overview of Darwin area, lodging, proposed distribution of lab and office space.
Lori Chappel to lead weather overview.
Topics to include:
Climatology of Darwin. Break vs monsoon, frequency of convection summary of satellite and radar statistics. Large scxale interactions (McBride?)
Predictability of convection at T-2 days, T-1 day, T-6 hrs, and T-1 hr for aircraft operations.
Brief discussion on longer term forecasts e.g. influence of active MJO events and the use of Mat Wheeler’s MJO forecasts? This could affect planning for density of flight IOP’s.
This is assuming that the main weather sensitive part of the operations is related to the aircraft – everything else will operate on a routine basis through the experiment. What lead times are required for various platforms?
Description and demonstration of tools available for analysis to include satellite displays, NWP displays, web products and most importantly for flight operations radar display. There will be a need to discuss what additional capability is desired/required for the radar display – e.g. Overlays of aircraft positions and tracks.
What is required to achieve this?
PM
Organsiation protocols for determining missions
Data policy(ies) by group – what data will be made public? ARM has an open policy so all its data and data sources funded by ARM will be available to the community via the ARM archive.
Updates on status : Ground based network (sondes, radars, lidars)
Fluxes
Ship plans
3rd parties (e.g. University scientists bringinginstruments)
Total 2 hrs
Model activity overview (30 min)
A-Train- orbits/over flights (30 min) Implications for missions.
Brief summary of aircraft status, aims (10 min /group).
Tour of forecast office?
Day 2.
AM
Aircraft configuration (1 hr)
Flight planning
Coordination
Joint operation of aircraft
Who calls shots
Command/analysis structure
Comms requirements
What tools are required to manage the aircraft –what gaps?
Air traffic control.
Roles of participating scientists, both in Darwin and remotely. What product set to be available in real time, near real time? Access to data repository.
Science goals to be met by group
Mission plans
PM
Scenarios for flights to include replaying of satellite and radar for at least 2 cases.
Will require replay facilities for satellite, NWP and radar – a combination of web pages and Bureau’s 3D rapic system.
Day 3.
Grand tour of sites?
Airport, Gunn Point, Point Stewart (AWS site), stop and see the jumping crocs?
i.e Do we want a semi-relaxed day with serious visits to facilities but include a recreation component?
Day 4.
AM
Forecast “trial” planning. How, where, by whom? Would seem to need to handle this as an exercise for a few days a week in Jan Feb using web based information. This would include .
Contingency planning.
What to do if e.g.
Missing 1 or more aircraft
Tropical cyclone in general area?
Tropical cyclone directly affecting IOP area – evacuate – where to etc?
Break versus active monsoon versus suppressed conditions.
PM
ARM ARCS site visit.
Meeting RAAF
Site inspections on RAAF base
Hangars, lab space etc.
Day 5
Inspections continue.
Some people may not be required for latter part and likewise some people may want to spend some of the early part of the week addressing facilities, housing, spares etc.