Canberra

                                                                                                   

26.1.4 Adjustment and forfeiture of allocation/claim on regulated flows—urban water access entitlement/arrangement

                             

Supporting information   


This line item refers to the amount of water that was allocated, but not abstracted under Actew’s urban water access entitlement.

 

Quantification approach   


Data source

ACT Government Department of Environment, Climate Change, Energy and Water: Water Resource Information Database.

 

Data provider

ACT Government Department of Environment, Climate Change, Energy and Water.

 

Method

For all ACT water access entitlements, the licensed water management year was from 01 July 2009 to 30 June 2010.

Any unused allocation at the end of the reporting period (30 June 2010) is forfeited. As Actew’s licence to take water does not distinguish between regulated and unregulated entitlements, the unregulated abstraction from the Murrumbidgee River has been subtracted from the total urban water access entitlement. The total forfeiture calculation has also excluded the volume of water transferred from Mount Stromlo Water Treatment Plant to Googong Reservoir, as it is not counted as an abstraction under ACTEW’s Licence to take water. Therefore, total forfeiture for the reporting period is equal to the total annual allocation for all surface water resources within the Canberra region (see Line item 23.8), minus the total allocation diversion of regulated flows (see Line item 19.8.4) minus the diversion of unregulated flows for urban water access entitlement (see Line item 14.6.2), plus the other lumped water distribution system increase (see Line item 20.7).

This is shown in the following table.

 

Account (line item)

Volume (ML)

 

23.8 Allocation announcement on regulated flows

71,000

minus

19.3.1 Unregulated diversion

1,941

minus

19.8.4 Allocation diversion of regulated flows

48,029

plus

20.7 Other lumped water distribution system decreases

4,681

 

Total adjustment and forfeiture

25,711

 

Uncertainty

Ungraded.

 

Assumptions, approximations and caveats/limitations

  • The total forfeiture reported in this line item excludes the 4,681 ML that was transferred from Mount Stromlo Water Treatment Plant to Googong Reservoir. This is because according to the ACTEW’s Licence to take water, usage for this purpose is not counted against the water access entitlements.