This line item represents the total volume of water transferred out of the South East Queensland (SEQ) region to the Tarong Power Station in the 2009-10 reporting period (8,764 ML).
WaterHub database (meter M-086-MW).
SEQ Water Grid Manager.
The volume of water exported out of the SEQ region to the Tarong Power Station in the 2009–10 reporting period was extracted from the WaterHub database. This volume was the metered flow through the Western Corridor Recycled Water Scheme Pipeline to the Tarong Power Station.
Derived from measured data. Ungraded.
None.