The volume of water discharged from urban wastewater systems during 2009–10 was 59,475 ML.
A breakdown of treated water from wastewater treatment plants and water recycling plants discharged to the streams is provided in the following table. The discharged volume is a decrease to the water distribution system store.
Plant operator and description of wastewater discharge |
Plant |
Discharging to watercourse |
Volume discharged during 2009–10 (ML) |
---|---|---|---|
Goulburn Mulwaree Council—treated wastewater from wastewater treatment plants |
Goulburn and Marulan |
Not applicable |
0* |
Lithgow City Council—treated wastewater from wastewater treatment plants |
Lithgow |
A tributary of the Coxs River |
1,516 |
Wallerawang |
Coxs River |
218 |
|
Palerang Council—treated wastewater from wastewater treatment plants |
Braidwood |
A tributary of the Shoalhaven River |
79 |
Shoalhaven City Council—treated wastewater from wastewater treatment plants |
Berry |
Broughton Creek |
149 |
Bomaderry |
Abernathys Creek |
927 |
|
Nowra |
Shoalhaven River |
1,666 |
|
Sydney Water Corporation—treated wastewater from water recycling plants |
Castle Hill |
Cattai Creek |
2,645 |
Glenfield |
Georges River |
101 |
|
Liverpool |
Georges River |
1,361 |
|
Penrith |
Boundary Creek |
8,356 |
|
Picton |
Stonequarry Creek |
0** |
|
Quakers Hill |
Breakfast Creek |
11,369 |
|
Richmond |
Rickabys Creek |
223 |
|
Rouse Hill |
Second Ponds Creek |
3,513 |
|
St Marys |
South Creek |
7,999 |
|
West Camden |
Matahil Creek |
1,126 |
|
Sydney Water Corporation—treated wastewater from wastewater treatment plants |
Brooklyn |
Hawkesbury River |
75 |
Fairfield |
Orphan School Creek |
872 |
|
Hornsby Heights |
Calna Creek |
2,106 |
|
North Richmond |
Redbank Creek |
292 |
|
Riverstone |
Eastern Creek |
600 |
|
Wallacia |
Warragamba River |
211 |
|
West Hornsby |
Waitara Creek |
4,520 |
|
Winmalee |
Nepean River |
6,465 |
|
Wingecarribee Shire Council—treated wastewater from wastewater treatment plants |
Berrima |
Olbury Creek |
78 |
Bowral |
Wingecarribee River |
1,127 |
|
Braemar |
Iron Mines Creek |
785 |
|
Bundanoon |
Reedy Creek |
303 |
|
Moss Vale |
Whites Creek |
793 |
|
Total |
59,475 |
* 1,569 ML was received at the plants for treatment. All treated water was used for irrigation.
** During 2009–10, received wastewater was treated to produce recycled water for on-site and agricultural uses.
Wallerawang wastewater treatment plant receives wastewater generated from supplies made to the Lithgow City Council’s distribution system from the Fish River Water Supply Scheme. Lithgow wastewater treatment plant receives wastewater generated from supplies made to the distribution system from Oakey Park Water Treatment Plant. Wastewater received at these wastewater treatment plants includes inflow and infiltration resulting from stormwater.
Treated water released from some of the wastewater treatment plants included in the above table becomes inflow to downstream reservoirs as shown in the following table. (Line item 13.7.1 does not include these releases and, therefore, the volumes for the line items 20.4.1 and 13.7.1 are not equal.)
Treated water released from wastewater treatment plants received at reservoirs
Wastewater treatment plants releasing treated water |
Reservoir receiving treated water |
Wastewater treatment plant operator |
Reservoir managing authority |
---|---|---|---|
Lithgow |
Lake Lyell |
Lithgow City Council |
Delta Electricity |
Wallerawang |
Lake Wallace |
Lithgow City Council |
Delta Electricity |
Berrima, Bowral, Braemar and Bundanoon |
Lake Burragorang (Warragamba Dam) |
Wingecarribee Shire Council |
The Sydney Catchment Authority |
Moss Vale |
Medway |
Wingecarribee Shire Council |
Wingecarribee Shire Council |
Braidwood |
Lake Yarrunga (Tallowa Dam) |
Palerang Council |
The Sydney Catchment Authority |
This line item comprises six different data-sets. The method for each data-set is shown below.
Quantification approaches are not provided because the volume discharged was zero.
Data spreadsheets.
Lithgow City Council.
Flows were measured by water channel and height sensors, and converting water level to a volume in a spreadsheet using a rating table.
The volume was estimated from measured data. Uncertainty is ungraded.
Wastewater received at Lithgow and Wallerawang wastewater treatment plants includes inflow and infiltration resulting from stormwater, in addition to wastewater generated from potable water supplies made to the water distribution system. Therefore, all of these sources contribute to the volume of treated wastewater released from the plants to the streams.
Database maintained as spreadsheets.
Palerang Council.
For 2009–10, the wastewater treatment plant (now decommissioned) did not have any dedicated flow measurement at the outlet. The outflow from the plant was from a tertiary pond system. Measurement was made at the inlet to the plant only and this was done by an ABB Magmaster-type flow meter. The inflow measured from the flow meter has been approximated to the outflow, disregarding any inflow that may be lost through evaporation, or that may be supplemented through rainfall or infiltration to the pond system.
The volume was estimated from measured data. Estimated uncertainty based on meter accuracy and professional judgment is +/–10%.
Nil.
Shoalhaven City Council.
Outflows from wastewater treatment plants were measured as follows:
The volume is based on measured data. Estimated uncertainty based on meter accuracy is +/–5%.
Nil.
Data managed and maintained in an internal data management system by Sydney Water Corporation’s (SWC) Operations Division.
Sydney Water Corporation.
The value represents the sum of total metered volume of treated wastewater discharge to surface water from wastewater treatment plants and water recycling plants managed by Sydney Water Corporation.
The flow of wastewater from the plants was measured using flow meters. These measured data are continually monitored and recorded. The data is stored within a complex data management system. Adjustments are made to the data (if necessary) to correct any interruptions, errors and so on. Data have been extracted for 2009–10 from the data management system.
The volume is based on measured data. Estimated uncertainty based on meter accuracy is +/–2%.
Nil.
Supervisory control and data acquisition (SCADA) data records from wastewater treatment plants.
Wingecarribee Shire Council.
The value represents the total volume of treated wastewater discharge to surface water from wastewater treatment plants.
The flow of wastewater from the plants was measured using ABB Magmaster flow meters installed on-site. The data from the flow meters are continually monitored and recorded.
The volume is based on measured data. Estimated uncertainty based on meter accuracy and professional judgment is +/–7%. External flow verification audits for the flow meters are conducted annually by Hydrometric Consulting Services.
Nil.