Melbourne
9.11 Delivery of water under inter-region agreement

Supporting Information

The volume presented in the water accounting statements (20,376 ML) represents the volume of water delivered to Melbourne retail authorities City West Water, South East Water and Yarra Valley Water under:

 

  • bulk entitlements for Thomson Reservoir, and Silver and Wallaby creeks
  • agreement for water held in Lake Eildon.

The volume of water delivered to the Melbourne region during the 2010–11 year was far less than the volume delivered for the previous period (84,444 ML). This was attributable to the volume of water delivered from Thomson Reservoir. Due to the high rainfall during the 2010–11 year Melbourne Water (in its capacity as the storage operator) optimised harvesting of water within the Melbourne region to allow storage volumes in the Thomson Reservoir to recover.

The following table presents the breakdown of the delivery of water to the Melbourne Region during the 2010–11 year.

Delivery of water under inter-region claims
Delivery component Volume (ML)
Delivery from Thomson Reservoir 1,600
Delivery from Silver and Wallaby creeks 11,300
Delivery from Lake Eildon 7,476
Total 20,376
Delivery from Thomson Reservoir

Bulk entitlements allow the Melbourne retail water authorities to divert water from Thomson Reservoir up to a combined limit of 171,800 ML per year (subject to rules specified in the Bulk Entitlement). Water stored in Thomson Reservoir is delivered to Upper Yarra Reservoir for distribution to Melbourne's water supply system.

Delivery from Silver and Wallaby creeks

Bulk entitlements allow the authorities to divert water from Silver and Wallaby creeks up to a combined limit of 66,000 ML during a three-year period (subject to rules specified in the bulk entitlement). Water is diverted from Silver and Wallaby creeks, and delivered to Tooroorung Reservoir and Yan Yean Reservoir for distribution to Melbourne's water supply system.

Delivery from Lake Eildon

The Water Savings Supply and Transfer Agreement allows the Melbourne retail authorities to divert up to 75,000 ML per year of water they collectively hold in Lake Eildon via the North–South Pipeline.

In late 2010, the Victorian Government introduced its policy to phase out Melbourne's reliance on the North–South Pipeline. In future years, the pipeline will only be used for critical human needs and only when there is sufficient water in the Goulburn system.

Quantification Approach

Data Source

Melbourne Water: Waterworks database.

Provided by

Melbourne Water.

Method

The total volume of water delivered to the Melbourne region under an inter-region claims is the sum of the following components

Thomson Reservoir

The volume of water delivered from Thomson Reservoir was measured by the depth of water flowing over the spillway chute at the inflow point to Upper Yarra Reservoir (which behaves as an Ogee weir) using a Mindata 2100P level sensor. The water depth was converted to flow using a stage–discharge relationship.

Silver and Wallaby creeks

The volume of water delivered from the Silver and Wallaby creeks to the Toorourrong and Yan Yean Reservoirs occurs via Clearwater Channel. Clearwater Channel also diverts water from the Plenty River (in the Melbourne region) to Yan Yean Reservoir. The total volume of water transferred along the Clearwater Channel was metered after the point where water enters from Plenty River.

Based on historical records of catchment runoff, the flow along Clearwater Channel was estimated to comprise 64% of the water delivered from the Silver and Wallaby catchments, and 36% of water diverted from the Plenty River.

The volume of water transferred-in from the Silver and Wallaby catchments was derived by multiplying the Clearwater Channel meter reading by a factor of 0.64.

Lake Eildon

The volume of water delivered from Lake Eildon was measured at the North–South Pipeline Pump Station. There are six pumps at the pump station, which are divided evenly into two pump-well groups. The total volume of water diverted from the Goulburn River was calculated as the sum of the volume pumped from the two wells, measured using a Siemens Sitrans SONOKIT dual-beam ultrasonic flow meter.

Assumptions, Limitations, Caveats and Approximations

·         The factor applied to derive the flow from water delivered from Silver and Wallaby creeks is an assumption based on historical data. 

Uncertainty Information

The uncertainty relates to the accuracy of the measurement device used to measure the volume of water transferred-in. The uncertainty for each delivery is shown below:

·         Thomson Reservoir: estimated uncertainty is +/– 2%

·         Silver and Wallaby Creeks: estimated uncertainty is +/– 1%

·         Lake Eildon: estimated uncertainty is +/– 1%.

Comparative year

This item corresponds to line item 13.6.3 Delivery of water transferred-in under inter-basin agreement to connected surface water reported in the 2010 Account. A typographical error in the volume reported in the 2010 Account was identified, which caused the 2009–10 year volume to be restated.

This change and the respective volumes are detailed in the following table. The restated comparative year volume is 84,444 ML.

Restated comparative year information for line item 9.11 Delivery of water under inter-region agreement

2010 Account line item name

Volume at 30 June 2010 reported in the 2010 Account (ML)

Value difference to volume reported due to prior period error correction (ML)

Volume at 30 June 2010 reported in 2011 Account (ML)

13.6.3 Delivery of water transferred-in under inter-basin agreement to connected surface water

84,443

1

84,444