11.6 Delivery of desalinated water to urban water system

Supporting information

The volumetric value for the line item at the end of the 2011–12 year was 3,427 ML.

The Gold Coast desalination plant was designed and constructed in response to the unprecedented drought in South East Queensland and the need for a non-climate dependent water source.

This line item represents the volume of potable water produced by the Tugun desalination plant located within the Gold Coast Water Resource Plan area (3,427 ML), and transferred into the South East Queensland (SEQ) water grid.

Quantification approach

Data source

Seqwater WaterHub database metered data (meter M-056-MW) provided by Seqwater.

Provided by

SEQ Water Grid Manager (merged with Seqwater since July 2013).

Method

Based on master meter readings (meter M-056-MW) summed to provide an annual total. The data were extracted from the WaterHub database by the SEQ Water Grid Manager; however, the original meter reading and data entry into the database were undertaken by WaterSecure (WaterSecure merged with Seqwater on 1 July 2011).

Assumptions, limitations, caveats and approximations

None.

Uncertainty information

Meter manufacturer (Promag) estimates an accuracy of 0.26 to 0.37%.