Bureau of Meteorology logo
 
                           

Melbourne

                                                                                                   

20.4.2 Wastewater discharge out of region

                             

Supporting information   


The volume recognised in the water accounting statements (208,934 ML) represents the volume of wastewater discharged from the Melbourne region to Port Phillip Bay and Bass Strait.

The table below shows the breakdown of wastewater discharge for each treatment plant by water utility in the Melbourne region during 2009–10.

 

Volume of wastewater discharged for each treatment plant in the Melbourne region
Utility Discharge location Volume (ML)
Melbourne Water Western Treatment Plant discharge to Port Phillip Bay

93,663

Eastern Treatment Plant discharge to Bass Strait

102,627

Melbourne Water subtotal

 196,290

City West Water Altona Sewage Treatment Plant (STP) discharge to Port Phillip Bay

4,584

City West Water subtotal

 4,584

South East Water Somers STP discharge to South East Outfall

1,154

Mt Martha STP discharge to South East Outfall

4,273

Boneo STP discharge to South East Outfall

2,633

South East Water subtotal

8,060

Total

208,934

 

Quantification approach   


Data source

Melbourne Water: Waterworks database.
City West Water: supervisory control and data acquisition (SCADA) database.
South East Water: various internal sources.

Data provider

Melbourne Water, City West Water and South East Water.

Method

The total volume of wastewater discharge out of the region is the sum of a number of components that are provided from different water utilities as described below.

Melbourne Water

This item represents the sum of the volume of wastewater discharge to sea (including Port Phillip Bay) from Melbourne Water’s Western Treatment Plant and Eastern Treatment Plant.

City West Water
This item represents the daily metered volume of treated wastewater discharged from the Altona wastewater treatment plant to Port Phillip Bay. The line item was calculated by deducting the metered volume of water used in-process within the treatment plant from the metered wastewater discharge value.

South East Water
This item represents the daily metered volume of treated wastewater discharged to the sea via the South East Outfall.

Uncertainty

Melbourne Water: Determined using a mass balance approach of all wastewater collected, treated, stored and recycled. Uncertainty is ungraded.

City West Water: Derived from metered data. Estimated uncertainty is +/–5%.

South East Water: Derived from metered data. Estimated uncertainty is +/–5%.

Uncertainty values provided by City West Water and South East Water refer to the Essential Services Commission’s standard confidence grades, as detailed in its June 2005 guideline for Approving, Conducting and Reporting Audits for Victorian Water Businesses (ESC 2005). Refer to Summary Audit Report – Regulatory Audit of AGL Energy Limited, October 2010 (ESC 2010) prepared individually for Yarra Valley Water and South East Water.

Approximations, assumptions, caveats/limitations

Nil.