Bureau of Meteorology logo
 
                           

Perth

                                                                                                   

References

                             

Australian Bureau of Rural Sciences 2010, Catchment scale land use mapping for Australia – update March 2010, http://adl.brs.gov.au/mapserv/landuse/index.cfm?fa=

Australian Bureau of Statistics (ABS) 2011, Regional population growth, Australia, 2009-10, ABS, http://www.abs.gov.au/AUSSTATS/abs@.nsf/DetailsPage/3218.02009-10?OpenDocument

Department of Water 2009, Guidelines for water meter installation 2009. Report no. 2, Government of Western Australia, Perth, www.water.wa.gov.au/PublicationStore/first/87712.pdf

Department of Water 2009a, Gingin surface water allocation plan, Draft for public comment, Government of Western Australia, Perth, www.water.wa.gov.au/PublicationStore/first/77214.pdf

Department of Water 2009b, Perth-Peel regional water plan 2010–2030: responding to our drying climate, Draft for public comment, Government of Western Australia, Perth, www.water.wa.gov.au/PublicationStore/first/90639.pdf

Department of Water 2010, Lower Canning River surface water allocation plan, Draft for public comment, Government of Western Australia, Perth, www.water.wa.gov.au/PublicationStore/first/95013.pdf

Government of Western Australia 2010, Rights in Water and Irrigation Act 1914: An act to make provision for the regulation, management, use and protection of water resources, to provide for irrigation schemes, and for related purposes, http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_844_homepage.html

Jones, DA, Wang, W & Fawcett, R 2007. Climate data for the Australian Water Availability Project. Final milestone report 36, National Climate Centre, Bureau of Meteorology, Melbourne. http://adl.brs.gov.au/brsShop/data/awapfinalreport200710.pdf

Radin, L, Pauli, N, La Spina, K, Braimbridge, M & Malseed, B 2010. Ecological water requirements for the lower Canning River, Department of Water, Government of Western Australia, Perth.

Raupach, MR, Briggs, PR, Haverd, V, King, EA, Paget, M & Trudinger, CM 2008. Australian Water Availability Project (AWAP): CSIRO Marine and Atmospheric Research Component. Final report for phase 3, CSIRO Marine and Atmospheric Research, Caberra, Australia.

Storey, AW & Davies, PM 2002. Preliminary ecological water requirements for Gingin and Lennard Brooks, report prepared for Water and Rivers Commission, University of Western Australia, Perth.

van Dijk, A 2010. The Australian water resources assessment system. Version 0.5. 3.0.5. Technical description of the landscape hydrology model (AWRA-L).

Water and Rivers Commission 2000, Environmental Water Provisions Policy for Western Australia, Water and Rivers Commission, Statewide Policy No. 5, www.water.wa.gov.au/PublicationStore/first/11676.pdf

Water Corporation 2009, Perth residential water use study: 2008-09. Water Forever, Water Corporation, Perth, www.thinking50.com.au

Water Corporation 2009, Water forever: towards climate resilience – summary, Water Corporation, Perth.

Water Corporation 2010, Integrated Water Supply Scheme water monitoring summary: 2009-10. Infrastructure Planning Branch Report no. A4, unpublished.