Bureau of Meteorology logo
 
                           

Sydney

                                                                                                   

20.4.3 Other lumped waste water discharge

                             

Supporting information   


Delta Electricity discharged a total metered volume of 6,160 ML from Wallerawang Power Station to the Coxs River (upstream of Lake Lyell). Industrial wastewater from the power station was treated and discharged to the river.

 

Quantification approaches   


Data source

Delta Electricity data spreadsheets.

 

Data provider

Delta Electricity.

 

Method

Ultrasonic flow meters were used to measure discharge from the power stations.

 

Uncertainty

The volume is based on measured data. Estimated uncertainty based on meter accuracy is +/–2%. Meters are regularly calibrated. The NSW Office of Water conducts an annual verification review on Delta Electricity’s water data.

 

Approximations, assumptions, caveats/limitations

Discharge from power stations flows to the Coxs River and its tributaries.